For this assignment, you will prepare a construction schedule (network logic diagram) using the attached Excel spreadsheet. Upload your completed schedule using the assignment link above. *Refer back to the videos provided in the Module 3 lesson which will walk you through the process of calculating the network elements.


Instructions:

  1. See the construction schedule (network logic diagram) on the attached spreadsheet “Construction Scheduling Assignment.”
  2. For each part of the network provided, please calculate the following and place the correct figure in the appropriate box (see the network “Key” on the diagram):
    • Early Start
    • Early Finish
    • Late Start
    • Late Finish
    • Total Float
  3. Below the diagram (in the space provided on the spreadsheet), please indicate the:
    • Minimum overall project duration
    • Critical path

Requirements: as specified

WRITE MY PAPER


Leave a Reply